Stockland engaged DCE to assess development options for levels and earthworks for the redevelopment of the Oak Grange retirement village in Brighton East.
A variety of options were investigated. All options needed to result in no adverse impact to the surrounding urban environment whilst providing protection to:
DCE adapted a catchment-scale TULFLOW model of the Elster Creek catchment to provide increased resolution and data sensitivity at and around the subject site. DCE worked closely with the project architects to trial multiple options for the site, ensuring that only mitigation options that were practical were investigated, in keeping with the pragmatic nature of the flood investigation.
DCE proposed a multi-use garden area adjacent to Union Street and Elster Creek that was ultimately selected as the preferred option. In extreme rainfall events, the garden provides additional flood storage—protecting Oak Grange and adjacent properties from flooding. In normal conditions, the garden provides streetscape amenity and increased urban cooling within a highly-developed area.
Melbourne Wurundjeri
03 9813 7400
Level 3, 678 Victoria Street
Richmond VIC 3121
info@dceng.com.au
Geelong Wadawurrung
03 5246 1700
60 Moorabool St
Geelong VIC 3220
Brisbane Turrbal
07 3374 9000
Level 14, 167 Eagle Street
Brisbane QLD 4000
Dalton Consulting Engineers acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community.
We pay our respect to their Elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.