


Location
Mickleham, Victoria
Client
Yarra Valley Water
The project involved 1100m of 375/450 MSCL distribution main and 300m of reticulation main including flowmeter and associated telemetry installations.
Some of the major challenges included coordination with the VicRoads Donnybrook Road / Hume Freeway interchange works. Around 300m of laser controlled bores through hard basalt across the Hume Freeway and Donnybrook Road was also required.