Rodds Drain Upgrade was for 900m of Melbourne Water channel upgrade works located in Dandenong South.
DCE were engaged by Little Projects to undertake the design, hydraulic modelling, project management and construction supervision services to complete the Rodds Drain upgrade. The Rodds Drain channel upgrade included twin 1.80m x 1.50m box culverts which were constructed to allow Fox Drive to cross over the Rodds Drain channel. It also included seven 1.80m x 0.60m box culverts which were constructed to allow Taylors Road construction. Other works included rock lining of batters along the channel where the grade of the batter was steeper than 1 in 3.
Melbourne Wurundjeri
03 9813 7400
Level 3, 678 Victoria Street
Richmond VIC 3121
info@dceng.com.au
Geelong Wadawurrung
03 5246 1700
60 Moorabool St
Geelong VIC 3220
Brisbane Turrbal
07 3374 9000
Level 14, 167 Eagle Street
Brisbane QLD 4000
Dalton Consulting Engineers acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community.
We pay our respect to their Elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.