The Laverton Creek drainage project for Melbourne Water required the construction of drainage culverts and associated structures to allow the passage of a significant drainage catchment beneath the Melbourne to Ballarat railway line in Ravenhall.
The 7 No 1650mm diameter culverts were constructed by microtunelling using state of the art tunnel boring machines in complex ground conditions. Each tunnel ‘drive’ took approximately two weeks to complete, and was required to be undertaken at night, outside of railway operating hours.
DCE was engaged by Melbourne Water to design and project manage the $6 million project which included significant stakeholder negotiations with parties including V Line, VicTrack, VicRoads and numerous Land Owners and Developers. The project provides a drainage outfall for a number of industrial developments in the area.
Melbourne Wurundjeri
03 9813 7400
Level 3, 678 Victoria Street
Richmond VIC 3121
info@dceng.com.au
Geelong Wadawurrung
03 5246 1700
60 Moorabool St
Geelong VIC 3220
Brisbane Turrbal
07 3374 9000
Level 14, 167 Eagle Street
Brisbane QLD 4000
Dalton Consulting Engineers acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community.
We pay our respect to their Elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.