Racing.com Park – Flood Mapping

DCE is proud to have been the principal consultant for the Pakenham Racecourse Relocation to Tynong project, delivering Victoria’s first new thoroughbred track in almost forty years. Location: Tynong, Victoria Client: Pakenham Racing Club Project Outline The 250-ha greenfield site adjacent to Ararat Creek is former Koo Wee Rup floodplains. External to existing drainage schemes, […]
Todd Road Branch Sewer

DCE was engaged by MAB Corporation to design and project manage the Todd Road Branch Sewer, providing an outfall for a commercial development in the Port Melbourne area. Location: Port Melbourne, Victoria Client: MAB Project Outline The project presented a number of challenges associated with construction in ground water of approximately 8m deep and the […]
Smith & Co

Smith & Co is a mixed use development at 132-172 Smith Street, Fitzroy and compromises of a Coles Supermarket, specialty shops and a residential apartment complex configured in four unique buildings: The Stanley, The Treadway, The Langride and Little Oxford. Location: Fitzroy, Victoria Client: Banco Group & Freeman Developments Project Outline DCE were engaged by […]
Bloomdale Vineyard Road Roundabout

DCE was the Leading Engineering Consultant manage the design and construction of Vineyard Road roundabout and road widening works for AVID Property Group as part of Bloomdale Residential Development in Diggers Rest. Location: Diggers Rest, Victoria Client: AVID Property Group Project Outline Vineyard Road Roundabout & road widening works were a critical infrastructure for Melton […]
Westleigh Drive & Geelong Road

This project involves the construction of the intersection of Westleigh Drive and Geelong Road (Princes Hwy) at the Riverwalk project in Werribee for Places Victoria (formerly VicUrban). The signalised cross intersection works include road and drainage, and traffic signalling works in accordance with VicRoads construction standards. Location: Port Melbourne, Victoria Client: MAB Project Outline DCE […]
Alliance Business Park

DCE was appointed by MAB Pty Ltd as a Leading Engineering Consultant for Alliance Business Park, a 34 Hectare industrial development in Epping. Location: Epping, Victoria Client: MAB Pty Ltd Year Completed: 2022 Project Outline Alliance Business Park Development was developed as a single stage development and the works signalised intersection for Vicroads/DoT, Extension of […]
Mordialloc Freeway Upgrade

Mordialloc Freeway upgrade was a project located in the South East of Melbourne which Major Road Projects Victoria (MRPV) were completing. Location: Mordialloc, Victoria Client: Major Road Projects Victoria Project Outline The project was being undertaken by McConnel Dowel Decmil Joint Venture (MCDDJV) as Principal Contractor and DCE had been engaged by MCDDJV to complete […]
Oak Grange – Flood Mapping

Stockland engaged DCE to assess development options for levels and earthworks for the redevelopment of the Oak Grange retirement village in Brighton East. Location: Brighton East, Victoria Client: Stockland Project Outline A variety of options were investigated. All options needed to result in no adverse impact to the surrounding urban environment whilst providing protection to: […]
Ravenhall Outfall Sewer

DCE were appointed as the head infrastructure consultant by Dexus for the development of Horizon 3023, a 3 Stage 120 Hectare industrial development located at 91-167 Palm Springs Rd, Ravenhall. A key element to providing a sewer outfall for the site was the delivery of City West Water’s (CCW) Ravenhall Outfall Sewer. Location: Ravenhall, Victoria […]
Geelong Road Distribution Water Mains

Project Outline The water main works in Geelong Road, Werribee, include the upgrade of the existing potable water main and the extension of the recycled water main as part of City West Water’s broader strategy for delivering recycled water to the greater Werribee area. The recycled water extension will provide the first recycled water supply […]