DCE was engaged by Pomeroy Pacific to provide detailed design and construction supervision on the sewer relocation works at Dandenong Road, Oakleigh.
The project involved micro tunnelling / laser guided boring between bored pier piling that was in place by the builders constructing the new multi story apartment complex and under Dandenong Road. The sewer pipe used for this project was 200m of DN250 GRP and 50m of 225 PVC. Due to existing services present throughout the alignment of the sewer works, constant monitoring of the alignment was required on top of the detailed service proving exercise completed. The project was successfully completed on budget and time to allow the construction of the multi story apartment complex.
Melbourne Wurundjeri
03 9813 7400
Level 3, 678 Victoria Street
Richmond VIC 3121
info@dceng.com.au
Geelong Wadawurrung
03 5246 1700
60 Moorabool St
Geelong VIC 3220
Brisbane Turrbal
07 3374 9000
Level 14, 167 Eagle Street
Brisbane QLD 4000
Dalton Consulting Engineers acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community.
We pay our respect to their Elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.