A key element of DCE’s work on MAB Corporation’s University Hill mixed use development was the design and construction of both the Plenty Road Intersection at McKimmie Road and Janefield Drive and the Western Ring Road Off Ramp to Plenty Road.
The Plenty Road intersection at McKimmie Road and Janefield Drive was essential to the efficiency of traffic flow through the new development as this formed the main entrance to the University Hill Township. Given the scale if this development the Plenty Road Off Ramp has provided an easier and more direct method of accessing the township.
The two new intersections on the six lane Plenty Road involved new signals, tram superstops and VicRoads approval. These were all managed, designed and supervised by DCE.
Melbourne Wurundjeri
03 9813 7400
Level 3, 678 Victoria Street
Richmond VIC 3121
info@dceng.com.au
Geelong Wadawurrung
03 5246 1700
60 Moorabool St
Geelong VIC 3220
Brisbane Turrbal
07 3374 9000
Level 14, 167 Eagle Street
Brisbane QLD 4000
Dalton Consulting Engineers acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community.
We pay our respect to their Elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.