To service the over 900Ha MAB Corporation / Gibson Property Corporation Merrifield development precinct and adjoining properties, DCE completed the investigation, design and contract administration for the Donnybrook Road Distribution Water Main for Yarra Valley Water Ltd.
The project involved 1100m of 375/450 MSCL distribution main and 300m of reticulation main including flowmeter and associated telemetry installations.
Some of the major challenges included coordination with the VicRoads Donnybrook Road / Hume Freeway interchange works. Around 300m of laser controlled bores through hard basalt across the Hume Freeway and Donnybrook Road was also required.
Melbourne Wurundjeri
03 9813 7400
Level 3, 678 Victoria Street
Richmond VIC 3121
info@dceng.com.au
Geelong Wadawurrung
03 5246 1700
60 Moorabool St
Geelong VIC 3220
Brisbane Turrbal
07 3374 9000
Level 14, 167 Eagle Street
Brisbane QLD 4000
Dalton Consulting Engineers acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community.
We pay our respect to their Elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.